After extraction, the gilsonite (natural bitumen) is transported by truck to the Bisotun Micronization Plant for further processing. Located approximately 5 km from Bisotun and 235 km from the Garaveh Mine, the facility converts the raw material into micronized powder through advanced grinding technology. The finished product is available in standard bag packaging as well as jumbo bags (FIBCs), with customized particle size distributions to meet specific customer and industrial requirements.
